Verified · Jun 21, 2026

No working DC fast chargers in Pinckney yet

Just 5 Level 2 ports across Non-Networked, Blink Network.

Live reliability
0 working now none down

Stations · 2

97% working at Michigan · verified Jun 7, 2026

DDA- Parking Lot

135 West Main Street
Working
Blink Network Level 2 4 ports J1772
95% working

Pinckney Chrysler Dodge Jeep RAM

1295 E Main St
Working
Non-Networked Level 2 1 port J1772
98% working
Home charging in Michigan costs 21.2¢/kWh — a full charge (60 kWh) costs about $12.72. Compare electricity prices →
All 2 stations active as of 2026-06-21 See full Michigan outage report →

Which EV Charging Networks Operate in Pinckney, MI?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 5 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 2.5

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Pinckney, Michigan has 2 publicly accessible EV charging stations with 5 charging ports. Non-Networked operates 50% of stations in the area, followed by Blink Network at 50% — part of Michigan's 2,139 stations statewide.

All 5 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 264 stations in nearby Detroit, approximately 72 miles away. See how MI compares with Ohio for broader regional context.

What Is the EV Charging Outlook for Pinckney?

Level 2 Focused Infrastructure

Pinckney's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Where Else Can I Charge Near Pinckney?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.