Verified · Jun 21, 2026

1 working DC fast charger in Ottawa Lake

All verified working this week, with 1 Level 2 port across Non-Networked, eVgo Network.

Live reliability
1 working now none down

Stations · 2

97% working at Michigan · verified Jun 7, 2026

Pilot Travel Center 26

6158 US-223
Working
eVgo Network DC Fast 4 ports CCS/SAE Combo
98% working

Whiteford Township Park

7200 Whiteford Rd
Working
Non-Networked Level 2 1 port J1772
98% working
Home charging in Michigan costs 21.2¢/kWh — a full charge (60 kWh) costs about $12.72. Compare electricity prices →
All 2 stations active as of 2026-06-21 See full Michigan outage report →

Which EV Charging Networks Operate in Ottawa Lake, MI?

Infrastructure Grade

80% DC Fast

Based on DC Fast Charger ratio

4 of 5 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 2.5

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Ottawa Lake, Michigan has 2 publicly accessible EV charging stations with 5 charging ports. Non-Networked operates 50% of stations in the area, followed by eVgo Network at 50% — part of Michigan's 2,139 stations statewide.

80% of ports (4) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 20% (1) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our EV charging levels guide. View national charging statistics for broader context.

Drivers needing more charging options can find 264 stations in nearby Detroit, approximately 82 miles away. See how MI compares with Ohio for broader regional context.

What Is the EV Charging Outlook for Ottawa Lake?

High-Speed Charging Hub

Ottawa Lake has exceptional DC fast charging coverage with 80% of ports being high-speed chargers, well above the national average.

Where Else Can I Charge Near Ottawa Lake?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.