3 EV Charging Stations in Commerce Charter Twp, MI

Locations, networks, and charger types — updated weekly from U.S. DOE data

3
Charging Stations

3 EV charging stations in Commerce Charter Twp — 3 RED_E , 2 public DC fast chargers. Last updated May 9, 2026.

Where Are the 3 Charging Stations in Commerce Charter Twp?

Hampton Inn Commerce

169 Loop Rd
RED_E Public
J1772 (Level 2)

TownePlace Suites Commerce

199 Loop Rd
RED_E Public
J1772 (Level 2)

Marathon Commerce Market Spirits

519 W Commerce Rd
RED_E Public
CCS/SAE Combo
All 3 stations active as of 2026-05-09 See full Michigan outage report →

Which EV Charging Networks Operate in Commerce Charter Twp, MI?

Infrastructure Grade

20% DC Fast

Based on DC Fast Charger ratio

2 of 10 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 3
Ports per Station 3.3

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Commerce Charter Twp, Michigan has 3 publicly accessible EV charging stations with 10 charging ports. RED_E operates 100% of stations in the area — part of Michigan's 2,114 stations statewide.

20% of ports (2) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 80% (8) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 264 stations in nearby Detroit, approximately 39 miles away. See how MI compares with Ohio for broader regional context.

What Is the EV Charging Outlook for Commerce Charter Twp?

RED_E Stronghold

RED_E leads the market in Commerce Charter Twp with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Commerce Charter Twp?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)