Verified · Jun 21, 2026

2 working DC fast chargers in Falmouth

All verified working this week, with 18 Level 2 ports across Tesla Destination, ChargePoint Network, Non-Networked.

Live reliability
2 working now none down

Stations · 12

99% working at Massachusetts · verified Jun 7, 2026

The Golf Club of Cape Cod - Tesla Destination

132 Falmouth Rd
Working
Tesla Destination Level 2 2 ports Tesla
98% working

The Palmer House Inn, a Select Registry Property - Tesla Destination

81 Palmer Ave
Working
Tesla Destination Level 2 2 ports Tesla
98% working

Ferry Parking

286 Palmer Ave
Working
Non-Networked Level 2 2 ports J1772
98% working

HUTKERARCHITECT HA

533 Palmer Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

ESTIA FALMOUTH ESTIA

117 Main St
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Working
Blink Network Level 2 2 ports J1772
95% working

FLOATREALTY FLOAT REALTY L2

82 Technology Park Drive
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Peg Noonan Parking Lot

240 Academy Ln
Working
AUTEL DC Fast 2 ports CCS/SAE Combo
98% working

SWTCH Energy

Sachem Dr
Working
SWTCH DC Fast 2 ports CHAdeMO
100% working

Iris Hotel Falmouth

291 Jones Rd.
Working
RED_E Level 2 2 ports J1772
96% working

The Captain's Manor Inn - Tesla Destination

27 W Main Street
Working
Tesla Destination Level 2 1 port Tesla
98% working

Falmouth Marine Park

180 Scranton Ave
Working
Non-Networked Level 2 1 port J1772
98% working
Home charging in Massachusetts costs 30.21¢/kWh — a full charge (60 kWh) costs about $18.13. Compare electricity prices →
All 12 stations active as of 2026-06-21 See full Massachusetts outage report →

Which EV Charging Networks Operate in Falmouth, MA?

Infrastructure Grade

18% DC Fast

Based on DC Fast Charger ratio

4 of 22 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 12
Ports per Station 1.8

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Falmouth, Massachusetts has 12 publicly accessible EV charging stations with 22 charging ports. Tesla Destination operates 25% of stations in the area, followed by ChargePoint Network at 25% — part of Massachusetts's 4,577 stations statewide.

18% of ports (4) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 82% (18) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our Tesla Supercharger network. View national charging statistics for broader context.

For regional context, see how Massachusetts's EV infrastructure compares with New York.

What Is the EV Charging Outlook for Falmouth?

Diverse Network Coverage

With 7 different charging networks available, EV drivers in Falmouth have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Falmouth?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Falmouth

1 hotel with on-site EV charging · 1 Tesla Destination · 2 Level 2 ports

The Palmer House Inn, a Select Registry Property

⚡ Tesla

81 Palmer Ave

🔌 2 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.