No working DC fast chargers in Carlisle yet
Just 6 Level 2 ports across ChargePoint Network.
Stations · 3
Which EV Charging Networks Operate in Carlisle, MA?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 6 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 24, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Carlisle, Massachusetts has 3 publicly accessible EV charging stations with 6 charging ports. ChargePoint Network operates 100% of stations in the area — part of Massachusetts's 4,577 stations statewide.
All 6 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 738 stations in nearby Boston, approximately 31 miles away. See how MA compares with New York for broader regional context.
What Is the EV Charging Outlook for Carlisle?
Level 2 Focused Infrastructure
Carlisle's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Carlisle with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Carlisle?
Boston, Massachusetts
Cambridge, Massachusetts
Worcester, Massachusetts
Marlborough, Massachusetts
Providence, Rhode Island
Quincy, Massachusetts
Lowell, Massachusetts
Waltham, Massachusetts
Somerville, Massachusetts
Framingham, Massachusetts
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."