Latest reported · Aug 10, 2026

1 working DC-fast station in Hurlock

All verified working this week, with 10 Level 2 ports across Non-Networked, Blink Network, ChargePoint Network.

Latest reported availability
1 working now none down

Active charging locations · 5

98% working at Maryland · verified Aug 10, 2026

Showing 5 useful public-access records selected from 5 active locations. Counts distinguish locations from 16 ports and 5 connector-type records; availability is periodically refreshed, not live.

Preston Ford - DCFC

4313 Preston Road
Working
Blink Network DC Fast 6 ports CCS/SAE Combo

Dorchester County Public Library - Hurlock Branch

222 S Main St
Working
Non-Networked Level 2 2 ports J1772

MAZDA HURLOCK CT4K

4309 Preston Rd
Working
ChargePoint Network Level 2 2 ports J1772

Preston Ford

4313 Preston Road
Working
Blink Network Level 2 4 ports J1772

Hurlock Park - Tennis Courts

200 Charles St
Working
Non-Networked Level 2 2 ports J1772

Local charging snapshot

Hurlock charging basics

5 public stations with 16 charging ports. 6 DC fast ports (38%) for quicker stops , plus 10 Level 2 ports (63%) for longer stays.

AFDC data last synced August 10, 2026.

5
stations
16
ports
6
DC fast
10
Level 2
Charging costs and cheapest hours in Hurlock
Home charging costs
Compare Maryland electricity prices →

Cheapest time to charge today

The cheapest, greenest grid window in Hurlock today is 2 AM – 5 AM EDT, based on PJM Interconnection day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Nearby city charging pages around Hurlock

EV charging questions for Hurlock

Which EV charging networks operate in Hurlock, MD?

Hurlock has 3 charging networks. Non-Networked operates 40% of stations, serving 5 total stations.

What is the EV charging outlook for Hurlock?

38% of Hurlock's charging ports are DC fast chargers and 63% are Level 2.

When is the cheapest time to charge an EV in Hurlock?

Today's cheapest, greenest grid window in Hurlock is 2 AM – 5 AM EDT, based on PJM Interconnection day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Dataset snapshot: August 10, 2026. Availability is periodically refreshed.