Verified · Jun 21, 2026

2 working DC fast chargers in Germantown

All verified working this week, with 37 Level 2 ports across ChargePoint Network, Non-Networked, AMPUP.

Live reliability
2 working now none down

Stations · 18

98% working at Maryland · verified Jun 7, 2026

Middlebrook Square Shopping Ctr

11500 Middlebrook Road
Working
Blink Network Level 2 4 ports J1772
95% working

EVsmart - Pepco - South Germantown Adventure Playground

17930 Germantown Park Dr
Working
SWTCH Level 2 4 ports J1772
100% working

DOE Germantown

19901 Germaton Rd
Working
Non-Networked Level 2 3 ports J1772
98% working

DOE, SWPA, Springfield Substation

2858 S Golden Ave
Working
Non-Networked Level 2 3 ports NEMA 14-50
98% working
Working
ChargePoint Network Level 2 2 ports J1772
99% working

GERMANTOWN MD STATION 1

19750 Germantown Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

GERMANTOWN MD STATION 2

19750 Germantown Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MTA MARC GERMANTOWN

19421 Walter Johnson Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Lerner R-3 Building

13110 Winged Foot Ln
Working
AMPUP Level 2 2 ports J1772
98% working

Lerner R-2 Building

13215 Oakland Hills Blvd
Working
AMPUP Level 2 2 ports J1772
98% working

Lerner M-2 Building

13221 Oakland Hills Blvd
Working
AMPUP Level 2 2 ports J1772
98% working

Lerner V-3 Building

304 Baltusrol Dr
Working
AMPUP Level 2 2 ports J1772
98% working

First Campus LP – Bldg. 1

20400 Observation Drive
Working
Blink Network Level 2 2 ports J1772
95% working

AUTUMN MIST AUTUMN MIST

18615 Autumn Mist Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Criswell Nissan

19574 Amaranth Dr
Working
Non-Networked Level 2 1 port J1772
98% working

GERMANTOWN MAIN OFFICE

12774 Wisteria Dr
Working
Non-Networked Level 2 1 port J1772
98% working

GERMANTOWN MD DC STATION 1

19750 Germantown Rd
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working

FERMI Site 38 Fuel Service Center

N Receiving Rd
Working
Non-Networked Level 2 1 port NEMA 14-50
98% working
Home charging in Maryland costs 35.85¢/kWh — a full charge (60 kWh) costs about $21.51. Compare electricity prices →
All 18 stations active as of 2026-06-21 See full Maryland outage report →

Which EV Charging Networks Operate in Germantown, MD?

Infrastructure Grade

3% DC Fast

Based on DC Fast Charger ratio

1 of 38 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 18
Ports per Station 2.1

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Germantown, Maryland has 18 publicly accessible EV charging stations with 38 charging ports. ChargePoint Network operates 33.3% of stations in the area, followed by Non-Networked at 27.8% — part of Maryland's 1,823 stations statewide.

3% of ports (1) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 97% (37) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Maryland's EV infrastructure compares with Pennsylvania.

What Is the EV Charging Outlook for Germantown?

Level 2 Focused Infrastructure

Germantown's charging network emphasizes Level 2 charging (97% of ports), ideal for overnight and workplace charging.

Diverse Network Coverage

With 5 different charging networks available, EV drivers in Germantown have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Germantown?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.