Verified · Jun 21, 2026

No working DC fast chargers in Annapolis Junction yet

Just 38 Level 2 ports across Blink Network, ChargePoint Network, Non-Networked.

Live reliability
0 working now none down

Stations · 19

98% working at Maryland · verified Jun 7, 2026

Verizon - Annapolis

10170 Junction Dr
Working
Non-Networked Level 2 4 ports J1772
98% working

MTA MARC SAVAGE3F

10102 Junction Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Blink Network Level 2 2 ports J1772
95% working

MTA MARC SAVAGE2F

10102 Junction Drive
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Annapolis Junction-10170

10170 Junction Drive
Working
Blink Network Level 2 2 ports J1772
95% working
Blink Network Level 2 2 ports J1772
95% working
Working
Blink Network Level 2 2 ports J1772
95% working
Blink Network Level 2 2 ports J1772
95% working
Blink Network Level 2 2 ports J1772
95% working
Blink Network Level 2 2 ports J1772
95% working
Working
Blink Network Level 2 2 ports J1772
95% working
Blink Network Level 2 2 ports J1772
95% working
Blink Network Level 2 2 ports J1772
95% working
Blink Network Level 2 2 ports J1772
95% working
Working
Blink Network Level 2 2 ports J1772
95% working
Blink Network Level 2 2 ports J1772
95% working
Working
Blink Network Level 2 2 ports J1772
95% working
Working
Blink Network Level 2 1 port J1772
95% working
Blink Network Level 2 1 port J1772
95% working
Home charging in Maryland costs 35.85¢/kWh — a full charge (60 kWh) costs about $21.51. Compare electricity prices →
All 19 stations active as of 2026-06-21 See full Maryland outage report →

Which EV Charging Networks Operate in Annapolis Junction, MD?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 38 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 19
Ports per Station 2.0

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Annapolis Junction, Maryland has 19 publicly accessible EV charging stations with 38 charging ports. Blink Network operates 84.2% of stations in the area, followed by ChargePoint Network at 10.5% — part of Maryland's 1,823 stations statewide.

All 38 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our Blink network. View national charging statistics for broader context.

For regional context, see how Maryland's EV infrastructure compares with Pennsylvania.

What Is the EV Charging Outlook for Annapolis Junction?

Level 2 Focused Infrastructure

Annapolis Junction's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Blink Network Stronghold

Blink Network leads the market in Annapolis Junction with 84% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Annapolis Junction?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.