No working DC fast chargers in Wells yet
Just 20 Level 2 ports across EVGATEWAY, Non-Networked, Tesla Destination.
Stations · 7
Haven By The Sea - Tesla Destination
59 Church StWells Reserve at Laudholm
55 Skinner Mill RdWhich EV Charging Networks Operate in Wells, ME?
Infrastructure Grade
29% DC Fast
Based on DC Fast Charger ratio
8 of 28 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 24, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Wells, Maine has 7 publicly accessible EV charging stations with 28 charging ports. EVGATEWAY operates 42.9% of stations in the area, followed by Non-Networked at 28.6% — part of Maine's 698 stations statewide.
29% of ports (8) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 71% (20) are Level 2 chargers suited for longer stops. Available connector types include Tesla (NACS). Learn more in our EV connector types guide. View national charging statistics for broader context.
For regional context, see how Maine's EV infrastructure compares with New Hampshire.
What Is the EV Charging Outlook for Wells?
Competitive Charging Market
No single network dominates Wells, with 4 providers competing to offer the best charging experience.
High-Capacity Stations
Charging stations in Wells average 4.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Wells?
Lowell, Massachusetts
Portland, Maine
Beverly, Massachusetts
Wilmington, Massachusetts
Salem, Massachusetts
Danvers, Massachusetts
Manchester, New Hampshire
Andover, Massachusetts
South Portland, Maine
Lawrence, Massachusetts
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
🏨 Charge While You Stay — Hotels with EV Charging in Wells
1 hotel with on-site EV charging · 1 Tesla Destination · 2 Level 2 ports
Haven By The Sea
⚡ Tesla59 Church St
Tesla Destination: full charge in 6–10 hrs overnight
📍 View on Map"City-to-city differences in climate, travel patterns, housing, charging preferences, and demographics aren't considerations captured in other infrastructure assessments. Making that data publicly available will prove pivotal as cities work to determine their network needs."