1 EV Charging Stations in St. Ansgar, IA

1 charging station in St. Ansgar, Iowa — Non-Networked

Updated Jun 7, 2026

Non-Networked
1
Charging Stations

1 EV charging stations in St. Ansgar — 1 Non-Networked . Last updated June 7, 2026.

Where Are the 1 Charging Stations in St. Ansgar?

Heartland Power Co-op

110 E Industrial Park Dr
24 hours daily
Non-Networked Utility
J1772 (Level 2)
Home charging in Iowa costs 13.42¢/kWh — a full charge (60 kWh) costs about $8.05. Compare electricity prices →
All 1 stations active as of 2026-06-07 See full Iowa outage report →

Which EV Charging Networks Operate in St. Ansgar, IA?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: Jun 8, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, St. Ansgar, Iowa has 1 publicly accessible EV charging station with 2 charging ports. Non-Networked operates 100% of stations in the area — part of Iowa's 505 stations statewide.

All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 55 stations in nearby Rochester, approximately 80 miles away. See how IA compares with Illinois for broader regional context.

What Is the EV Charging Outlook for St. Ansgar?

Level 2 Focused Infrastructure

St. Ansgar's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Non-Networked Stronghold

Non-Networked leads the market in St. Ansgar with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near St. Ansgar?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 7, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

Get weekly outage alerts for your state.

Free. One email per week. Unsubscribe anytime.