Verified · Jun 21, 2026

No working DC fast chargers in Cresco yet

Just 2 Level 2 ports across ZEFNET.

Live reliability
0 working now none down

Stations · 1

97% working at Iowa · verified Jun 7, 2026

MiEnergy Cooperative IA Public Charger

24049 Iowa 9
Working
ZEFNET Level 2 2 ports J1772
98% working
Home charging in Iowa costs 13.42¢/kWh — a full charge (60 kWh) costs about $8.05. Compare electricity prices →
All 1 stations active as of 2026-06-21 See full Iowa outage report →

Which EV Charging Networks Operate in Cresco, IA?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Cresco, Iowa has 1 publicly accessible EV charging station with 2 charging ports. ZEFNET operates 100% of stations in the area — part of Iowa's 505 stations statewide.

All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 55 stations in nearby Rochester, approximately 79 miles away. See how IA compares with Illinois for broader regional context.

What Is the EV Charging Outlook for Cresco?

Level 2 Focused Infrastructure

Cresco's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

ZEFNET Stronghold

ZEFNET leads the market in Cresco with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Cresco?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.