Verified · Jun 21, 2026

4 working DC fast chargers in Cedar Rapids

Plus 1 reported down this week and 60 Level 2 ports across ChargePoint Network, Non-Networked, Tesla Destination.

Live reliability
4 working now 1 reported down

Stations · 31

97% working at Iowa · verified Jun 7, 2026

Park Cedar Rapids - 4th Avenue Ramp

349 4th Ave SE
Working
Non-Networked Level 2 8 ports J1772
98% working

Hy-Vee Grocery Store - Tesla Supercharger

20 Wilson Ave Southwest
Working
Tesla DC Fast 8 ports Tesla
98% working

Park Cedar Rapids - Convention Center Ramp

361 1st Ave SE
Working
Non-Networked Level 2 4 ports J1772
98% working

McGrath Chrysler Jeep Dodge Ram

4610 Center Point Road Northeast
Working
Blink Network DC Fast 4 ports J1772 + CCS/SAE Combo
95% working

Tru by Hilton Cedar Rapids Westdale

3900 Westdale Pkwy SW
Working
TURNONGREEN Level 2 4 ports J1772
98% working

Schneider Electric - Visitor Lot

3400 Square D Dr SW
Working
Non-Networked Level 2 2 ports J1772
98% working

Best Western - Longbranch

90 Twixt Town Rd NE
Down
Non-Networked Level 2 2 ports J1772
98% working
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Best Western Longbranch - Tesla Destination

90 Twixt Town Rd NE
Working
Tesla Destination Level 2 2 ports Tesla
98% working

CID CHARGE PT SHORT TERM 1

2121 Arthur Collins Parkway South West
Working
ChargePoint Network Level 2 2 ports J1772
99% working

COE COLLEGE COE COLLEGE

1417 A Ave NE
Working
ChargePoint Network Level 2 2 ports J1772
99% working

625 1ST STREET GAB EV 1

625 1st St SE
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MAVERIK CEDAR RAPIDS DC

2604 16th Avenue Southwest
Working
ChargePoint Network DC Fast 2 ports CHAdeMO + CCS/SAE Combo
99% working

HOME2 STATION STATION 1

4000 Westdale Pkwy SW
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Indian Creek Nature Center

5300 Otis Rd SE
Down
CHARGELAB DC Fast 2 ports CHAdeMO + CCS/SAE Combo
98% working

The Meth-Wick Community

1224 13th Street NW
Working
EVGATEWAY Level 2 2 ports J1772
98% working

PARK CR 5

175 3rd St SW
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PARK CR 6

175 3rd St SW
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PARK CR 9

175 3rd St SW
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PARK CR 8

175 3rd St SW
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Home charging in Iowa costs 13.42¢/kWh — a full charge (60 kWh) costs about $8.05. Compare electricity prices →
2 stations reported unavailable as of 2026-06-21 See full Iowa outage report →

Which EV Charging Networks Operate in Cedar Rapids, IA?

Infrastructure Grade

19% DC Fast

Based on DC Fast Charger ratio

14 of 74 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 31
Ports per Station 2.4

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Cedar Rapids, Iowa has 31 publicly accessible EV charging stations with 74 charging ports. ChargePoint Network operates 54.8% of stations in the area, followed by Non-Networked at 22.6% — part of Iowa's 505 stations statewide.

19% of ports (14) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 81% (60) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Iowa's EV infrastructure compares with Illinois.

What Is the EV Charging Outlook for Cedar Rapids?

Diverse Network Coverage

With 8 different charging networks available, EV drivers in Cedar Rapids have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Cedar Rapids?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Cedar Rapids

3 hotels with on-site EV charging · 1 Tesla Destination · 8 Level 2 ports

Tru by Hilton Cedar Rapids Westdale

Level 2

3900 Westdale Pkwy SW

🔌 4 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map

Best Western - Longbranch

Level 2

90 Twixt Town Rd NE

🔌 2 ports · Public

Level 2: ~40–80mi range added per hour overnight

📍 View on Map

Best Western Longbranch

⚡ Tesla

90 Twixt Town Rd NE

🔌 2 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.