No working DC fast chargers in Fernan Lake Village yet
Just 4 Level 2 ports across ChargePoint Network.
Stations · 2
BO APARTMENTS BO-SOUTH
3141 N Atlas RdBO APARTMENTS BO-NORTH
3225 N Atlas RdWhich EV Charging Networks Operate in Fernan Lake Village, ID?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 4 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 23, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Fernan Lake Village, Idaho has 2 publicly accessible EV charging stations with 4 charging ports. ChargePoint Network operates 100% of stations in the area — part of Idaho's 274 stations statewide.
All 4 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 131 stations in nearby Spokane, approximately 45 miles away. See how ID compares with Washington for broader regional context.
What Is the EV Charging Outlook for Fernan Lake Village?
Level 2 Focused Infrastructure
Fernan Lake Village's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Fernan Lake Village with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Fernan Lake Village?
Spokane, Washington
Spokane Valley, Washington
Liberty Lake, Washington
Airway Heights, Washington
Medical Lake, Washington
Coeur d'Alene, Idaho
Post Falls, Idaho
Sandpoint, Idaho
Newport, Washington
Rosalia, Washington
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."