4 working DC fast chargers in Swainsboro
All verified working this week, with 0 Level 2 ports across ChargePoint Network.
Stations · 2
GEORGIA POWER SWAINSBORO DC1
125 S Main StGEORGIA POWER SWAINSBORO DC2
125 S Main StWhich EV Charging Networks Operate in Swainsboro, GA?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
100% DC Fast
Based on DC Fast Charger ratio
2 of 2 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 24, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Swainsboro, Georgia has 2 publicly accessible EV charging stations with 2 charging ports. ChargePoint Network operates 100% of stations in the area — part of Georgia's 2,507 stations statewide.
100% of ports (2) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 9 stations in nearby Dublin, approximately 58 miles away. See how GA compares with Florida for broader regional context.
What Is the EV Charging Outlook for Swainsboro?
High-Speed Charging Hub
Swainsboro has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Swainsboro with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Swainsboro?
Dublin, Georgia
Statesboro, Georgia
Vidalia, Georgia
Grovetown, Georgia
Reidsville, Georgia
Metter, Georgia
Millen, Georgia
Sandersville, Georgia
Louisville, Georgia
Ellabell, Georgia
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."