17 EV Charging Stations in McDonough, GA
Locations, networks, and charger types — updated weekly from U.S. DOE data
17 EV charging stations in McDonough — 6 ChargePoint Network, 4 Tesla Destination, 2 Tesla , 38 public DC fast chargers. Last updated May 9, 2026.
Where Are the 17 Charging Stations in McDonough?
Which EV Charging Networks Operate in McDonough, GA?
Infrastructure Grade
58% DC Fast
Based on DC Fast Charger ratio
38 of 65 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, McDonough, Georgia has 17 publicly accessible EV charging stations with 65 charging ports. ChargePoint Network operates 35.3% of stations in the area, followed by Tesla Destination at 23.5% — part of Georgia's 2,492 stations statewide.
58% of ports (38) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 42% (27) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.
For regional context, see how Georgia's EV infrastructure compares with Florida.
What Is the EV Charging Outlook for McDonough?
High-Speed Charging Hub
McDonough has exceptional DC fast charging coverage with 58% of ports being high-speed chargers, well above the national average.
Diverse Network Coverage
With 8 different charging networks available, EV drivers in McDonough have excellent flexibility in choosing their preferred provider.
Where Else Can I Charge Near McDonough?
Atlanta, Georgia
Alpharetta, Georgia
Duluth, Georgia
Lawrenceville, Georgia
Athens, Georgia
Sandy Springs, Georgia
Macon, Georgia
Marietta, Georgia
College Park, Georgia
Buford, Georgia
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
🏨 Charge While You Stay — Hotels with EV Charging in McDonough
2 hotels with on-site EV charging · 2 Tesla Destination · 8 Level 2 ports
Tru by Hilton Atlanta/McDonough
⚡ Tesla251 Avalon Ct
Tesla Destination: full charge in 6–10 hrs overnight
📍 View on MapHome2 Suites Atlanta South/McDonough
⚡ Tesla60 Mill Rd
Tesla Destination: full charge in 6–10 hrs overnight
📍 View on Map"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."
Brent Gruber
Executive Director, EV Practice, J.D. Power
Source: J.D. Power 2025 Public Charging Study (August 2025)