Verified · Jun 21, 2026

2 working DC fast chargers in Plant City

All verified working this week, with 30 Level 2 ports across ChargePoint Network, Tesla Destination, Non-Networked.

Live reliability
2 working now none down

Stations · 16

98% working at Florida · verified Jun 7, 2026

Wawa - Tesla Supercharger

2705 Thonotosassa Road
Working
Tesla DC Fast 8 ports Tesla
98% working

Century Lakehouse

3003 S Frontage Rd
Working
LOOP Level 2 6 ports J1772
98% working
Working
CHARGEUP Level 2 4 ports J1772
98% working

Jarrett-Scott Ford

2000 E Baker St
Working
Non-Networked DC Fast 3 ports J1772 + CCS/SAE Combo
98% working

HILLS COUNTY PLANT CITY 1

301 N Michigan Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Hampton Inn Plant City - Tesla Destination

2702 Thonotosassa Rd
Working
Tesla Destination Level 2 2 ports J1772 + Tesla
98% working

CITY FURNITURE PC SHOWROOM 2

3205 S Frontage Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CITY FURNITURE PC SHOWROOM 3

3205 S Frontage Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CITY FURNITURE PC SHOWROOM 4

3214 N Frontage Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CITY FURNITURE PC SHOWROOM 1

3205 S Frontage Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CITY FURNITURE PC OFFICES 5

3205 S Frontage Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CITY FURNITURE PC OFFICES 4

3205 S Frontage Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Jarrett Scott Ford

2000 E Baker St
Working
FORD_CHARGE DC Fast 2 ports CCS/SAE Combo
98% working

CITY FURNITURE PC OFFICES 3

3205 S Frontage Rd
Working
ChargePoint Network Level 2 1 port J1772
99% working

CITY FURNITURE PC OFFICES 1

3205 S Frontage Rd
Working
ChargePoint Network Level 2 1 port J1772
99% working

CITY FURNITURE PC OFFICES 2

3205 S Frontage Rd
Working
ChargePoint Network Level 2 1 port J1772
99% working
Home charging in Florida costs 14.86¢/kWh — a full charge (60 kWh) costs about $8.92. Compare electricity prices →
All 16 stations active as of 2026-06-21 See full Florida outage report →

Which EV Charging Networks Operate in Plant City, FL?

Infrastructure Grade

29% DC Fast

Based on DC Fast Charger ratio

12 of 42 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 16
Ports per Station 2.6

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Plant City, Florida has 16 publicly accessible EV charging stations with 42 charging ports. ChargePoint Network operates 62.5% of stations in the area, followed by Tesla Destination at 6.3% — part of Florida's 4,706 stations statewide.

29% of ports (12) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 71% (30) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Florida's EV infrastructure compares with Georgia.

What Is the EV Charging Outlook for Plant City?

Diverse Network Coverage

With 7 different charging networks available, EV drivers in Plant City have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Plant City?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Plant City

1 hotel with on-site EV charging · 1 Tesla Destination · 2 Level 2 ports

Hampton Inn Plant City

⚡ Tesla

2702 Thonotosassa Rd

🔌 2 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.