1 EV Charging Stations in Moosup, CT

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

1 EV charging stations in Moosup — 1 LOOP . Last updated May 9, 2026.

Where Are the 1 Charging Stations in Moosup?

1 Lake St

1 Lake St
24 hours daily
$1 activation fee; $0.40 per kWh
LOOP Other
J1772 (Level 2)
All 1 stations active as of 2026-05-09 See full Connecticut outage report →

Which EV Charging Networks Operate in Moosup, CT?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Moosup, Connecticut has 1 publicly accessible EV charging station with 2 charging ports. LOOP operates 100% of stations in the area — part of Connecticut's 1,701 stations statewide.

All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 738 stations in nearby Boston, approximately 96 miles away. See how CT compares with New York for broader regional context.

What Is the EV Charging Outlook for Moosup?

Level 2 Focused Infrastructure

Moosup's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

LOOP Stronghold

LOOP leads the market in Moosup with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Moosup?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)