1 EV Charging Stations in Bethany, CT
Locations, networks, and charger types — updated weekly from U.S. DOE data
1 EV charging stations in Bethany — 1 Non-Networked . Last updated May 9, 2026.
Where Are the 1 Charging Stations in Bethany?
Which EV Charging Networks Operate in Bethany, CT?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 2 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Bethany, Connecticut has 1 publicly accessible EV charging station with 2 charging ports. Non-Networked operates 100% of stations in the area — part of Connecticut's 1,701 stations statewide.
All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 138 stations in nearby New Haven, approximately 14 miles away. See how CT compares with New York for broader regional context.
What Is the EV Charging Outlook for Bethany?
Level 2 Focused Infrastructure
Bethany's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Non-Networked Stronghold
Non-Networked leads the market in Bethany with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Bethany?
New Haven, Connecticut
Hartford, Connecticut
Springfield, Massachusetts
Haverstraw, New York
East Hartford, Connecticut
Bristol, Connecticut
Stamford, Connecticut
Yonkers, New York
New London, Connecticut
White Plains, New York
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."