No working DC fast chargers in Firestone yet
Just 2 Level 2 ports across ChargePoint Network.
Stations · 1
ST.VRAIN PARK STATION 1
3525 state highway 119Which EV Charging Networks Operate in Firestone, CO?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 2 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 24, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Firestone, Colorado has 1 publicly accessible EV charging station with 2 charging ports. ChargePoint Network operates 100% of stations in the area — part of Colorado's 2,987 stations statewide.
All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 454 stations in nearby Denver, approximately 47 miles away. See how CO compares with Arizona for broader regional context.
What Is the EV Charging Outlook for Firestone?
Level 2 Focused Infrastructure
Firestone's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Firestone with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Firestone?
Denver, Colorado
Boulder, Colorado
Fort Collins, Colorado
Aurora, Colorado
Broomfield, Colorado
Westminster, Colorado
Loveland, Colorado
Longmont, Colorado
Littleton, Colorado
Golden, Colorado
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."