1 EV Charging Stations in Stevenson Ranch, CA

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

1 EV charging stations in Stevenson Ranch — 1 Electrify America , 4 public DC fast chargers. Last updated May 9, 2026.

Where Are the 1 Charging Stations in Stevenson Ranch?

Inventrust Stevenson Ranch Plaza (Stevenson Ranch,

24909 Pico Canyon Rd
24 hours daily
CCS/SAE Combo
All 1 stations active as of 2026-05-09 See full California outage report →

Which EV Charging Networks Operate in Stevenson Ranch, CA?

Infrastructure Grade

100% DC Fast

Based on DC Fast Charger ratio

4 of 4 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 4.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Stevenson Ranch, California has 1 publicly accessible EV charging station with 4 charging ports. Electrify America operates 100% of stations in the area — part of California's 20,622 stations statewide.

100% of ports (4) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our Electrify America network. View national charging statistics for broader context.

Drivers needing more charging options can find 2,004 stations in nearby Los Angeles, approximately 40 miles away. See how CA compares with Oregon for broader regional context.

What Is the EV Charging Outlook for Stevenson Ranch?

High-Speed Charging Hub

Stevenson Ranch has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.

Electrify America Stronghold

Electrify America leads the market in Stevenson Ranch with 100% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Stevenson Ranch average 4.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Stevenson Ranch?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)