No working DC fast chargers in Mather yet
Just 17 Level 2 ports across Non-Networked.
Stations · 2
VISN 21/NCHCS/Mather (612A4)_Mobile
10535 Hospital WayVISN 21/VA NORTHERN CA HCS
10535 Hospital WayWhich EV Charging Networks Operate in Mather, CA?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 17 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 23, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Mather, California has 2 publicly accessible EV charging stations with 17 charging ports. Non-Networked operates 100% of stations in the area — part of California's 20,670 stations statewide.
All 17 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 453 stations in nearby Sacramento, approximately 15 miles away. See how CA compares with Oregon for broader regional context.
What Is the EV Charging Outlook for Mather?
Level 2 Focused Infrastructure
Mather's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Non-Networked Stronghold
Non-Networked leads the market in Mather with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Mather average 8.5 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Mather?
Sacramento, California
Napa, California
Walnut Creek, California
Elk Grove, California
Roseville, California
Folsom, California
Stockton, California
Fairfield, California
Vacaville, California
Davis, California
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."