Verified · Jun 21, 2026

1 working DC fast charger in Livingston

All verified working this week, with 0 Level 2 ports across BP_PULSE.

Live reliability
1 working now none down

Stations · 1

98% working at California · verified Jun 7, 2026

TA, Winton Parkway, Livingston, CA

435 Winton Parkway
Working
BP_PULSE DC Fast 12 ports CCS/SAE Combo + Tesla
98% working
Home charging in California costs 33.35¢/kWh — a full charge (60 kWh) costs about $20.01. Compare electricity prices →
All 1 stations active as of 2026-06-21 See full California outage report →

Which EV Charging Networks Operate in Livingston, CA?

Infrastructure Grade

100% DC Fast

Based on DC Fast Charger ratio

12 of 12 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 12.0

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Livingston, California has 1 publicly accessible EV charging station with 12 charging ports. BP_PULSE operates 100% of stations in the area — part of California's 20,670 stations statewide.

100% of ports (12) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our EV charging levels guide. View national charging statistics for broader context.

Drivers needing more charging options can find 56 stations in nearby Stockton, approximately 83 miles away. See how CA compares with Oregon for broader regional context.

What Is the EV Charging Outlook for Livingston?

High-Speed Charging Hub

Livingston has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.

BP_PULSE Stronghold

BP_PULSE leads the market in Livingston with 100% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Livingston average 12.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Livingston?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.