1 EV Charging Stations in Le Grand, CA

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

1 EV charging stations in Le Grand — 1 Non-Networked . Last updated May 9, 2026.

Where Are the 1 Charging Stations in Le Grand?

Caltrans Chowchilla Truck Inspection Station

8820 S Highway 99
Non-Networked Truck Stop
J1772 (Level 2)
All 1 stations active as of 2026-05-09 See full California outage report →

Which EV Charging Networks Operate in Le Grand, CA?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 4 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 4.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Le Grand, California has 1 publicly accessible EV charging station with 4 charging ports. Non-Networked operates 100% of stations in the area — part of California's 20,622 stations statewide.

All 4 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 195 stations in nearby Fresno, approximately 63 miles away. See how CA compares with Oregon for broader regional context.

What Is the EV Charging Outlook for Le Grand?

Level 2 Focused Infrastructure

Le Grand's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Non-Networked Stronghold

Non-Networked leads the market in Le Grand with 100% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Le Grand average 4.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Le Grand?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)