2 EV Charging Stations in Tuba City, AZ
Locations, networks, and charger types — updated weekly from U.S. DOE data
2 EV charging stations in Tuba City — 1 Tesla Destination, 1 Non-Networked . Last updated May 9, 2026.
Where Are the 2 Charging Stations in Tuba City?
Which EV Charging Networks Operate in Tuba City, AZ?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 4 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Tuba City, Arizona has 2 publicly accessible EV charging stations with 4 charging ports. Tesla Destination operates 50% of stations in the area, followed by Non-Networked at 50% — part of Arizona's 1,583 stations statewide.
All 4 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Available connector types include Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.
Drivers needing more charging options can find 8 stations in nearby Grand Canyon Village, approximately 82 miles away. See how AZ compares with California for broader regional context.
What Is the EV Charging Outlook for Tuba City?
Level 2 Focused Infrastructure
Tuba City's charging network emphasizes Level 2 charging (75% of ports), ideal for overnight and workplace charging.
Where Else Can I Charge Near Tuba City?
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
🏨 Charge While You Stay — Hotels with EV Charging in Tuba City
1 hotel with on-site EV charging · 1 Tesla Destination · 3 Level 2 ports
Moenkopi Legacy Inn & Suites
⚡ Tesla1 Legacy Ln
Tesla Destination: full charge in 6–10 hrs overnight
📍 View on Map"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."