EV Charging Cost in Arizona: 15.59¢ per kWh

▼ 19% below US average
Residential electricity in Arizona costs 15.59¢/kWh (March 2026), the 23rd cheapest of all 50 states and DC. A full 60 kWh EV charge costs about $9.35 — roughly 30% more than North Dakota, the cheapest state at 11.95¢/kWh.

Latest EIA data: March 2026 Published May 24, 2026 Source: U.S. Energy Information Administration

15.59¢
per kWh ▼ 2.74% MoM
$9.35
Full 60 kWh charge
4.5¢
Cost per mile
$1,145
Annual savings vs gas*

Arizona Electricity Price Trend (24 Months)

14¢ 16¢ 17¢ 18¢ 20¢ Apr '24Oct '24Apr '25Oct '25Mar '26 15.59¢
Arizona US average

Charging Cost by Battery Size in Arizona

Battery Example EV Est. range Full charge (0–100%)
40 kWh Nissan Leaf 140 mi $6.24
60 kWh Typical EV 210 mi $9.35
80 kWh Tesla Model 3 LR 280 mi $12.47
100 kWh Tesla Model S 350 mi $15.59

Estimated range and charge cost assume 3.5 mi/kWh efficiency at Arizona's 15.59¢/kWh residential rate. *Annual savings assumes 1,000 miles/month vs a 25 MPG gas car at $3.50/gallon.

Over the past year, electricity in Arizona has increased 2.97%, from 15.14¢ to 15.59¢ per kWh.

Compare Arizona to Neighboring States

More for Arizona EV Drivers

Frequently Asked Questions

How much does electricity cost in Arizona?

Residential electricity in Arizona costs 15.59¢/kWh as of March 2026, according to the U.S. Energy Information Administration. That is 19% below the US average of 19.16¢/kWh, ranking Arizona the 23rd cheapest of all 50 states and DC.

How much does it cost to charge an EV in Arizona?

At 15.59¢/kWh, a full 0–100% charge costs about $6.24 for a 40 kWh battery, $9.35 for a typical 60 kWh EV, and $15.59 for a 100 kWh battery. That works out to roughly 4.5¢ per mile of driving.

Is it cheaper to drive an EV than a gas car in Arizona?

Yes. Driving 1,000 miles a month on electricity in Arizona costs about $535 a year, versus roughly $1,680 for a 25 MPG gas car at $3.50/gallon — an annual saving of about $1,145.

Electricity price from the U.S. Energy Information Administration (Form EIA-861), March 2026.