1 EV Charging Stations in Scotssdale, AZ
Locations, networks, and charger types — updated weekly from U.S. DOE data
1 EV charging stations in Scotssdale — 1 POWERPUMP . Last updated May 9, 2026.
Where Are the 1 Charging Stations in Scotssdale?
Which EV Charging Networks Operate in Scotssdale, AZ?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 2 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Scotssdale, Arizona has 1 publicly accessible EV charging station with 2 charging ports. POWERPUMP operates 100% of stations in the area — part of Arizona's 1,583 stations statewide.
All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 377 stations in nearby Phoenix, approximately 17 miles away. See how AZ compares with California for broader regional context.
What Is the EV Charging Outlook for Scotssdale?
Level 2 Focused Infrastructure
Scotssdale's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
POWERPUMP Stronghold
POWERPUMP leads the market in Scotssdale with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Scotssdale?
Phoenix, Arizona
Scottsdale, Arizona
Tempe, Arizona
Mesa, Arizona
Chandler, Arizona
Gilbert, Arizona
Goodyear, Arizona
Glendale, Arizona
Avondale, Arizona
Surprise, Arizona
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
🏨 Charge While You Stay — Hotels with EV Charging in Scotssdale
1 hotel with on-site EV charging · 2 Level 2 ports
Holiday Inn & Suites Scottsdale North
Level 214255 N 87th St
Level 2: ~40–80mi range added per hour overnight
📍 View on Map"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."