2 EV Charging Stations in Dateland, AZ

Locations, networks, and charger types — updated weekly from U.S. DOE data

2
Charging Stations

As of March 2026, Dateland, Arizona has 2 publicly accessible EV charging stations with 44 charging ports. Electrify America operates 50% of stations in the area, followed by Tesla at 50% — part of Arizona's 1,565 stations statewide.

100% of ports (44) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our Electrify America network. View national charging statistics for broader context.

Drivers needing more charging options can find 19 stations in nearby Yuma, approximately 98 miles away. See how AZ compares with California for broader regional context.

2 EV charging stations in Dateland — 1 Electrify America, 1 Tesla , 44 public DC fast chargers. Last updated March 2026.

Infrastructure Grade

100% DC Fast

Based on DC Fast Charger ratio

44 of 44 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 22.0

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Dateland, AZ?

All 2 stations active as of 2026-03-22 See full Arizona outage report →

Where Are the 2 Charging Stations in Dateland?

Dateland Travel Center - Tesla Supercharger

1737 Avenue 64 E
24 hours daily. Please check Tesla's online station map to see if an adapter is required at this location.
Tesla Travel Center
Tesla

Wellton Crude Parcel - Dateland AZ

1734 Ave 64 E
24 hours daily
CHAdeMO (DC Fast) CCS/SAE Combo

What Is the EV Charging Outlook for Dateland?

High-Speed Charging Hub

Dateland has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.

High-Capacity Stations

Charging stations in Dateland average 22.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Dateland?

Data source: U.S. Department of Energy — Alternative Fuels Data Center

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)