Verified · Jun 21, 2026

3 working DC fast chargers in Juneau

All verified working this week, with 25 Level 2 ports across Non-Networked, TURNONGREEN.

Live reliability
3 working now none down

Stations · 17

99% working at Alaska · verified Jun 7, 2026

Fred Meyer Juneau

8181 Glacier Hwy
Working
Non-Networked DC Fast 4 ports CHAdeMO + J1772
98% working

Alaska Electric Light & Power

5601 Tonsgard Ct
Working
Non-Networked Level 2 2 ports J1772
98% working

Marine Parking Garage

292 Marine Way
Working
Non-Networked Level 2 2 ports J1772
98% working

Douglas Library

1016 3rd St
Working
Non-Networked Level 2 2 ports J1772
98% working

Eaglecrest Ski Area

3000 Fish Creek Rd
Working
Non-Networked Level 2 2 ports J1772
98% working

Mendenhall Valley Public Library

3025 Diamond Park Loop
Working
Non-Networked Level 2 2 ports J1772
98% working

University of Alaska Southeast

11066 Auke Lake Way
Working
Non-Networked Level 2 2 ports J1772
98% working

Alaska State Library, Archives, and Museum

395 Whittier St
Working
Non-Networked Level 2 2 ports J1772
98% working
Working
TURNONGREEN Level 2 2 ports J1772
98% working

Avis Juneau (Downtown)

111 Mill St
Working
TURNONGREEN Level 2 2 ports J1772
98% working

Juneau Hydropower

8585 Old Dairy Hwy
Working
Non-Networked Level 2 1 port J1772
98% working

KTOO Public Media

360 Egan Dr
Working
Non-Networked Level 2 1 port J1772
98% working

Downtown Transit Center

100 Main St
Working
Non-Networked DC Fast 1 port CHAdeMO
98% working
Working
Non-Networked Level 2 1 port J1772
98% working

Alaskan Brewing Tap Room

5368 Commercial Blvd
Working
Non-Networked DC Fast 1 port CHAdeMO
98% working

Rock Dump Indoor Climbing Gym

1310 Eastaugh Way
Working
Non-Networked Level 2 1 port J1772
98% working

Tongass National Forest

6000 Glacier Spur Rd
Working
Non-Networked Level 2 1 port J1772
98% working
Home charging in Alaska costs 27.17¢/kWh — a full charge (60 kWh) costs about $16.30. Compare electricity prices →
1 station reported unavailable as of 2026-06-21 See full Alaska outage report →

Which EV Charging Networks Operate in Juneau, AK?

Infrastructure Grade

14% DC Fast

Based on DC Fast Charger ratio

4 of 29 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 17
Ports per Station 1.7

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Juneau, Alaska has 17 publicly accessible EV charging stations with 29 charging ports. Non-Networked operates 88.2% of stations in the area, followed by TURNONGREEN at 11.8% — part of Alaska's 84 stations statewide.

14% of ports (4) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 86% (25) are Level 2 chargers suited for longer stops. Available connector types include CHAdeMO. Learn more in our EV connector types guide. View national charging statistics for broader context.

What Is the EV Charging Outlook for Juneau?

Level 2 Focused Infrastructure

Juneau's charging network emphasizes Level 2 charging (86% of ports), ideal for overnight and workplace charging.

Non-Networked Stronghold

Non-Networked leads the market in Juneau with 88% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Juneau?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.