Verified · Jun 21, 2026

No working DC fast chargers in Sundance yet

Just 2 Level 2 ports across Non-Networked.

Live reliability
0 working now none down

Stations · 1

97% working at Wyoming · verified Jun 7, 2026

Powder River Energy Corp

221 E Main St
Working
Non-Networked Level 2 2 ports J1772
98% working
Home charging in Wyoming costs 13.59¢/kWh — a full charge (60 kWh) costs about $8.15. Compare electricity prices →
All 1 stations active as of 2026-06-21 See full Wyoming outage report →

Which EV Charging Networks Operate in Sundance, WY?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Sundance, Wyoming has 1 publicly accessible EV charging station with 2 charging ports. Non-Networked operates 100% of stations in the area — part of Wyoming's 129 stations statewide.

All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 9 stations in nearby Custer, approximately 94 miles away. See how WY compares with Colorado for broader regional context.

What Is the EV Charging Outlook for Sundance?

Level 2 Focused Infrastructure

Sundance's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Non-Networked Stronghold

Non-Networked leads the market in Sundance with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Sundance?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.