2 EV Charging Stations in ASHLAND, WI
Locations, networks, and charger types — updated weekly from U.S. DOE data
2 EV charging stations in ASHLAND — 1 EV Connect, 1 KWIK_CHARGE , 8 public DC fast chargers. Last updated May 9, 2026.
Where Are the 2 Charging Stations in ASHLAND?
Which EV Charging Networks Operate in ASHLAND, WI?
Infrastructure Grade
100% DC Fast
Based on DC Fast Charger ratio
8 of 8 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, ASHLAND, Wisconsin has 2 publicly accessible EV charging stations with 8 charging ports. EV Connect operates 50% of stations in the area, followed by KWIK_CHARGE at 50% — part of Wisconsin's 918 stations statewide.
100% of ports (8) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our EV charging levels guide. View national charging statistics for broader context.
Drivers needing more charging options can find 20 stations in nearby Duluth, approximately 94 miles away. See how WI compares with Michigan for broader regional context.
What Is the EV Charging Outlook for ASHLAND?
High-Speed Charging Hub
ASHLAND has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.
High-Capacity Stations
Charging stations in ASHLAND average 4.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near ASHLAND?
Duluth, Minnesota
Two Harbors, Minnesota
Bayfield, Wisconsin
Cable, Wisconsin
Ironwood, Michigan
Silver Bay, Minnesota
Bessemer, Michigan
Clam Lake, Wisconsin
Hayward, Wisconsin
Superior, Wisconsin
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."