2 EV Charging Stations in Murphy, TX

Locations, networks, and charger types — updated weekly from U.S. DOE data

2
Charging Stations

2 EV charging stations in Murphy — 1 eVgo Network, 1 WALMART , 12 public DC fast chargers. Last updated May 9, 2026.

Where Are the 2 Charging Stations in Murphy?

Walmart EV Charging

115 W FM 544
24 hours daily
$0.28 per kWh off-peak; $0.48 per kWh on-peak
WALMART Retail
CCS/SAE Combo Tesla

Murphy Marketplace

231 FM 544
24 hours daily
CHAdeMO (DC Fast) CCS/SAE Combo
All 2 stations active as of 2026-05-09 See full Texas outage report →

Which EV Charging Networks Operate in Murphy, TX?

Infrastructure Grade

100% DC Fast

Based on DC Fast Charger ratio

12 of 12 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 6.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Murphy, Texas has 2 publicly accessible EV charging stations with 12 charging ports. eVgo Network operates 50% of stations in the area, followed by WALMART at 50% — part of Texas's 4,003 stations statewide.

100% of ports (12) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our EVgo network. View national charging statistics for broader context.

Drivers needing more charging options can find 271 stations in nearby Dallas, approximately 28 miles away. See how TX compares with New Mexico for broader regional context.

What Is the EV Charging Outlook for Murphy?

High-Speed Charging Hub

Murphy has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.

High-Capacity Stations

Charging stations in Murphy average 6.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Murphy?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)