1 EV Charging Stations in Mineral Wells, TX

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

As of March 2026, Mineral Wells, Texas has 1 publicly accessible EV charging station with 1 charging port. EV Connect operates 100% of stations in the area — part of Texas's 3,976 stations statewide.

Drivers needing more charging options can find 123 stations in nearby Fort Worth, approximately 69 miles away. See how TX compares with New Mexico for broader regional context.

1 EV charging stations in Mineral Wells — 1 EV Connect , 1 public DC fast chargers. Last updated March 2026.

Infrastructure Grade

100% DC Fast

Based on DC Fast Charger ratio

1 of 1 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 1.0

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Mineral Wells, TX?

All 1 stations active as of 2026-03-22 See full Texas outage report →

Where Are the 1 Charging Stations in Mineral Wells?

Auto World Chevrolet of Mineral Wells

4316 US-180
Mon: 7:30am-5:00pm; Tue: 7:30am-5:00pm; Wed: 7:30am-5:00pm; Thu: 7:30am-5:00pm; Fri: 7:30am-5:00pm; Sat: 8:00am-1:00pm
EV Connect
CCS/SAE Combo

What Is the EV Charging Outlook for Mineral Wells?

High-Speed Charging Hub

Mineral Wells has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.

EV Connect Stronghold

EV Connect leads the market in Mineral Wells with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Mineral Wells?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: March 22, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)