1 EV Charging Stations in Hewitt, TX

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

1 EV charging stations in Hewitt — 1 CIRCLE_K , 4 public DC fast chargers. Last updated May 9, 2026.

Where Are the 1 Charging Stations in Hewitt?

CircleK - Hewitt, TX

720 Spring Valley Rd
24 hours daily
CIRCLE_K Convenience Store
CCS/SAE Combo
All 1 stations active as of 2026-05-09 See full Texas outage report →

Which EV Charging Networks Operate in Hewitt, TX?

Infrastructure Grade

100% DC Fast

Based on DC Fast Charger ratio

4 of 4 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 4.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Hewitt, Texas has 1 publicly accessible EV charging station with 4 charging ports. CIRCLE_K operates 100% of stations in the area — part of Texas's 4,003 stations statewide.

100% of ports (4) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our EV charging levels guide. View national charging statistics for broader context.

Drivers needing more charging options can find 15 stations in nearby Waco, approximately 8 miles away. See how TX compares with New Mexico for broader regional context.

What Is the EV Charging Outlook for Hewitt?

High-Speed Charging Hub

Hewitt has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.

CIRCLE_K Stronghold

CIRCLE_K leads the market in Hewitt with 100% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Hewitt average 4.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Hewitt?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)