Verified · Jun 21, 2026

No working DC fast chargers in Anthony yet

Just 0 Level 2 ports across Non-Networked.

Live reliability
0 working now none down

Stations · 1

98% working at Texas · verified Jun 7, 2026

FCI La Tuna

8500 Doniphan Dr
Working
Non-Networked Level 1 2 ports NEMA 5-15
98% working
Home charging in Texas costs 16.39¢/kWh — a full charge (60 kWh) costs about $9.83. Compare electricity prices →
All 1 stations active as of 2026-06-21 See full Texas outage report →

Which EV Charging Networks Operate in Anthony, TX?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Anthony, Texas has 1 publicly accessible EV charging station with 2 charging ports. Non-Networked operates 100% of stations in the area — part of Texas's 3,983 stations statewide.

All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 63 stations in nearby El Paso, approximately 26 miles away. See how TX compares with New Mexico for broader regional context.

What Is the EV Charging Outlook for Anthony?

Level 2 Focused Infrastructure

Anthony's charging network emphasizes Level 2 charging (0% of ports), ideal for overnight and workplace charging.

Non-Networked Stronghold

Non-Networked leads the market in Anthony with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Anthony?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.