1 EV Charging Stations in Rapid Ciy, SD
Locations, networks, and charger types — updated weekly from U.S. DOE data
As of March 2026, Rapid Ciy, South Dakota has 1 publicly accessible EV charging station with 4 charging ports. Electrify America operates 100% of stations in the area — part of South Dakota's 121 stations statewide.
100% of ports (4) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our Electrify America network. View national charging statistics for broader context.
Drivers needing more charging options can find 22 stations in nearby Rapid City, approximately 4 miles away. See how SD compares with Minnesota for broader regional context.
Infrastructure Grade
100% DC Fast
Based on DC Fast Charger ratio
4 of 4 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Mar 25, 2026
Data sourced from U.S. DOE AFDC
Which EV Charging Networks Operate in Rapid Ciy, SD?
Where Are the 1 Charging Stations in Rapid Ciy?
Target T2457 (Rapid City, SD)
What Is the EV Charging Outlook for Rapid Ciy?
High-Speed Charging Hub
Rapid Ciy has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.
Electrify America Stronghold
Electrify America leads the market in Rapid Ciy with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Rapid Ciy average 4.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Rapid Ciy?
Rapid City, South Dakota
Custer, South Dakota
Spearfish, South Dakota
Deadwood, South Dakota
Keystone, South Dakota
Hot Springs, South Dakota
Wall, South Dakota
Box Elder, South Dakota
Data source: U.S. Department of Energy — Alternative Fuels Data Center
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."