No working DC fast chargers in Boyertown yet
Just 6 Level 2 ports across Tesla Destination.
Stations · 1
Boyertown Museum of Historic Vehicles - Tesla Destination
85 S Walnut StWhich EV Charging Networks Operate in Boyertown, PA?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 6 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 23, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Boyertown, Pennsylvania has 1 publicly accessible EV charging station with 6 charging ports. Tesla Destination operates 100% of stations in the area — part of Pennsylvania's 2,153 stations statewide.
All 6 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Available connector types include Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.
Drivers needing more charging options can find 173 stations in nearby Philadelphia, approximately 58 miles away. See how PA compares with New York for broader regional context.
What Is the EV Charging Outlook for Boyertown?
Level 2 Focused Infrastructure
Boyertown's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Tesla Destination Stronghold
Tesla Destination leads the market in Boyertown with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Boyertown average 6.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Boyertown?
Philadelphia, Pennsylvania
Allentown, Pennsylvania
Lancaster, Pennsylvania
Wilmington, Delaware
Newark, Delaware
King of Prussia, Pennsylvania
Bethlehem, Pennsylvania
New Castle, Delaware
Reading, Pennsylvania
Princeton, New Jersey
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."