1 EV Charging Stations in Arcadia, OK
Locations, networks, and charger types — updated weekly from U.S. DOE data
As of March 2026, Arcadia, Oklahoma has 1 publicly accessible EV charging station with 2 charging ports. Non-Networked operates 100% of stations in the area — part of Oklahoma's 428 stations statewide.
All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 91 stations in nearby Oklahoma City, approximately 24 miles away. See how OK compares with Texas for broader regional context.
1 EV charging stations in Arcadia — 1 Non-Networked . Last updated March 2026.
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 2 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Mar 25, 2026
Data sourced from U.S. DOE AFDC
Which EV Charging Networks Operate in Arcadia, OK?
Where Are the 1 Charging Stations in Arcadia?
What Is the EV Charging Outlook for Arcadia?
Level 2 Focused Infrastructure
Arcadia's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Non-Networked Stronghold
Non-Networked leads the market in Arcadia with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Arcadia?
Oklahoma City, Oklahoma
Edmond, Oklahoma
Norman, Oklahoma
Stillwater, Oklahoma
Yukon, Oklahoma
Midwest City, Oklahoma
El Reno, Oklahoma
Shawnee, Oklahoma
Chickasha, Oklahoma
Moore, Oklahoma
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: March 22, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."