11 EV Charging Stations in Pittsboro, NC
Locations, networks, and charger types — updated weekly from U.S. DOE data
As of March 2026, Pittsboro, North Carolina has 11 publicly accessible EV charging stations with 35 charging ports. Blink Network operates 54.5% of stations in the area, followed by ChargePoint Network at 36.4% — part of North Carolina's 2,009 stations statewide.
All 35 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our Blink network. View national charging statistics for broader context.
For regional context, see how North Carolina's EV infrastructure compares with Georgia.
11 EV charging stations in Pittsboro — 6 Blink Network, 4 ChargePoint Network, 1 Non-Networked . Last updated March 2026.
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 35 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Mar 25, 2026
Data sourced from U.S. DOE AFDC
Which EV Charging Networks Operate in Pittsboro, NC?
Where Are the 11 Charging Stations in Pittsboro?
What Is the EV Charging Outlook for Pittsboro?
Level 2 Focused Infrastructure
Pittsboro's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Where Else Can I Charge Near Pittsboro?
Raleigh, North Carolina
Durham, North Carolina
Cary, North Carolina
Greensboro, North Carolina
Morrisville, North Carolina
Chapel Hill, North Carolina
Fayetteville, North Carolina
Apex, North Carolina
Wake Forest, North Carolina
Asheboro, North Carolina
Data source: U.S. Department of Energy — Alternative Fuels Data Center
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."
Brent Gruber
Executive Director, EV Practice, J.D. Power
Source: J.D. Power 2025 Public Charging Study (August 2025)