1 EV Charging Stations in Pilot Mountain, NC
Locations, networks, and charger types — updated weekly from U.S. DOE data
1 EV charging stations in Pilot Mountain — 1 ChargePoint Network . Last updated May 9, 2026.
Where Are the 1 Charging Stations in Pilot Mountain?
Which EV Charging Networks Operate in Pilot Mountain, NC?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 2 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Pilot Mountain, North Carolina has 1 publicly accessible EV charging station with 2 charging ports. ChargePoint Network operates 100% of stations in the area — part of North Carolina's 2,023 stations statewide.
All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 51 stations in nearby Greensboro, approximately 65 miles away. See how NC compares with Georgia for broader regional context.
What Is the EV Charging Outlook for Pilot Mountain?
Level 2 Focused Infrastructure
Pilot Mountain's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Pilot Mountain with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Pilot Mountain?
Greensboro, North Carolina
Mooresville, North Carolina
Blacksburg, Virginia
Winston-Salem, North Carolina
Danville, Virginia
Statesville, North Carolina
Burlington, North Carolina
High Point, North Carolina
Salisbury, North Carolina
Christiansburg, Virginia
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."