No working DC fast chargers in Colfax yet
Just 0 Level 2 ports across Tesla.
Stations · 1
Which EV Charging Networks Operate in Colfax, NC?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
100% DC Fast
Based on DC Fast Charger ratio
8 of 8 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 23, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Colfax, North Carolina has 1 publicly accessible EV charging station with 8 charging ports. Tesla operates 100% of stations in the area — part of North Carolina's 2,003 stations statewide.
100% of ports (8) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.
Drivers needing more charging options can find 123 stations in nearby Durham, approximately 99 miles away. See how NC compares with Georgia for broader regional context.
What Is the EV Charging Outlook for Colfax?
High-Speed Charging Hub
Colfax has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.
Tesla Stronghold
Tesla leads the market in Colfax with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Colfax average 8.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Colfax?
Durham, North Carolina
Greensboro, North Carolina
Mooresville, North Carolina
Chapel Hill, North Carolina
Winston-Salem, North Carolina
Concord, North Carolina
Asheboro, North Carolina
Danville, Virginia
Statesville, North Carolina
Burlington, North Carolina
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."