1 EV Charging Stations in Loch Sheldrake, NY
Locations, networks, and charger types — updated weekly from U.S. DOE data
1 EV charging stations in Loch Sheldrake — 1 VIALYNK . Last updated May 9, 2026.
Where Are the 1 Charging Stations in Loch Sheldrake?
Which EV Charging Networks Operate in Loch Sheldrake, NY?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 8 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Loch Sheldrake, New York has 1 publicly accessible EV charging station with 8 charging ports. VIALYNK operates 100% of stations in the area — part of New York's 5,508 stations statewide.
All 8 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 76 stations in nearby Haverstraw, approximately 88 miles away. See how NY compares with Massachusetts for broader regional context.
What Is the EV Charging Outlook for Loch Sheldrake?
Level 2 Focused Infrastructure
Loch Sheldrake's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
VIALYNK Stronghold
VIALYNK leads the market in Loch Sheldrake with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Loch Sheldrake average 8.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Loch Sheldrake?
Haverstraw, New York
Kingston, New York
Mahwah, New Jersey
Poughkeepsie, New York
Middletown, New York
Hudson, New York
New Paltz, New York
Oneonta, New York
Red Hook, New York
Goshen, New York
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."