30 EV Charging Stations in Baldwinsville, NY

Locations, networks, and charger types — updated weekly from U.S. DOE data

30
Charging Stations

As of March 2026, Baldwinsville, New York has 30 publicly accessible EV charging stations with 136 charging ports. VIALYNK operates 70% of stations in the area, followed by ChargePoint Network at 16.7% — part of New York's 5,410 stations statewide.

7% of ports (10) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 93% (126) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our EV connector types guide. View national charging statistics for broader context.

For regional context, see how New York's EV infrastructure compares with Massachusetts.

Infrastructure Grade

7% DC Fast

Based on DC Fast Charger ratio

10 of 136 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 30
Ports per Station 4.5

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Baldwinsville, NY?

Where Are the 30 Charging Stations in Baldwinsville?

Timber Banks - West

24 hours daily
VIALYNK
10 Level 2
J1772 (Level 2)

Timber Banks - East

24 hours daily
VIALYNK
10 Level 2
J1772 (Level 2)

Candlewood Gardens

24 hours daily
VIALYNK
10 Level 2
J1772 (Level 2)

Microtel Inn & Suites-Baldwinsville

24 hours daily
CHARGESMART_EV
10 Level 2
J1772 (Level 2)

Village Green Apartments - 3000s

24 hours daily
VIALYNK
8 Level 2
J1772 (Level 2)

Village Green Apartments - 400s

24 hours daily
VIALYNK
8 Level 2
J1772 (Level 2)

Village Green Apartments - 500 A

24 hours daily
VIALYNK
8 Level 2
J1772 (Level 2)

Village Green Apartments - 600s

24 hours daily
VIALYNK
8 Level 2
J1772 (Level 2)

Aldi Baldwinsville TUL40

RED_E Public
8 DC Fast
CCS/SAE Combo Tesla

St. Mary's of the Assumption

24 hours daily
VIALYNK
6 Level 2
J1772 (Level 2)

Village Green Apartments - 100s

24 hours daily
VIALYNK
6 Level 2
J1772 (Level 2)

Village Green Apartments - Community Center

24 hours daily
VIALYNK
6 Level 2
J1772 (Level 2)

Greymoor Way - Building 2

24 hours daily
VIALYNK
4 Level 2
J1772 (Level 2)

BEAVER LAKE BEAVER LAKE 2

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

BEAVER LAKE BEAVER LAKE 1

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

BVILLELIBRARY STATION 1

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

Greymoor Way - Building 1

24 hours daily
VIALYNK
2 Level 2
J1772 (Level 2)

Greymoor Way - Building 4

24 hours daily
VIALYNK
2 Level 2
J1772 (Level 2)

Greymoor Way - Building 7

24 hours daily
VIALYNK
2 Level 2
J1772 (Level 2)

Greymoor Way - Building 8

24 hours daily
VIALYNK
2 Level 2
J1772 (Level 2)

What Is the EV Charging Outlook for Baldwinsville?

Level 2 Focused Infrastructure

Baldwinsville's charging network emphasizes Level 2 charging (93% of ports), ideal for overnight and workplace charging.

Diverse Network Coverage

With 6 different charging networks available, EV drivers in Baldwinsville have excellent flexibility in choosing their preferred provider.

High-Capacity Stations

Charging stations in Baldwinsville average 4.5 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Baldwinsville?

Data source: U.S. Department of Energy — Alternative Fuels Data Center

"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)