2 EV Charging Stations in Medford, NJ

Locations, networks, and charger types — updated weekly from U.S. DOE data

2
Charging Stations

2 EV charging stations in Medford — 1 Tesla, 1 Blink Network , 12 public DC fast chargers. Last updated May 9, 2026.

Where Are the 2 Charging Stations in Medford?

Wawa - Tesla Supercharger

257 Rt 70
24 hours daily. Please check Tesla's online station map to see if an adapter is required at this location.
Tesla Gas Station
CCS/SAE Combo Tesla

Medford Cornerstone Urban Renewal

370 Stokes Road
24 hours daily
J1772 (Level 2)
All 2 stations active as of 2026-05-09 See full New Jersey outage report →

Which EV Charging Networks Operate in Medford, NJ?

Infrastructure Grade

75% DC Fast

Based on DC Fast Charger ratio

12 of 16 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 8.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Medford, New Jersey has 2 publicly accessible EV charging stations with 16 charging ports. Tesla operates 50% of stations in the area, followed by Blink Network at 50% — part of New Jersey's 1,930 stations statewide.

75% of ports (12) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 25% (4) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.

Drivers needing more charging options can find 173 stations in nearby Philadelphia, approximately 31 miles away. See how NJ compares with New York for broader regional context.

What Is the EV Charging Outlook for Medford?

High-Speed Charging Hub

Medford has exceptional DC fast charging coverage with 75% of ports being high-speed chargers, well above the national average.

High-Capacity Stations

Charging stations in Medford average 8.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Medford?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)