1 EV Charging Stations in Desloge, MO
Locations, networks, and charger types — updated weekly from U.S. DOE data
1 EV charging stations in Desloge — 1 ChargePoint Network . Last updated May 9, 2026.
Where Are the 1 Charging Stations in Desloge?
Which EV Charging Networks Operate in Desloge, MO?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 2 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Desloge, Missouri has 1 publicly accessible EV charging station with 2 charging ports. ChargePoint Network operates 100% of stations in the area — part of Missouri's 1,400 stations statewide.
All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 135 stations in nearby St. Louis, approximately 87 miles away. See how MO compares with Illinois for broader regional context.
What Is the EV Charging Outlook for Desloge?
Level 2 Focused Infrastructure
Desloge's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Desloge with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Desloge?
St. Louis, Missouri
Clayton, Missouri
Chesterfield, Missouri
Saint Louis, Missouri
Fenton, Missouri
Creve Coeur, Missouri
St. Charles, Missouri
Festus, Missouri
Ballwin, Missouri
Sullivan, Missouri
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."