2 EV Charging Stations in Douglas, MI

Locations, networks, and charger types — updated weekly from U.S. DOE data

2
Charging Stations

2 EV charging stations in Douglas — 2 RED_E , 2 public DC fast chargers. Last updated May 9, 2026.

Where Are the 2 Charging Stations in Douglas?

Weathervane Mall

102 Blue Star Hwy
RED_E Public
CCS/SAE Combo

City of the Village of Douglas

15 S Washington St
RED_E Public
J1772 (Level 2)
1 station reported unavailable as of 2026-05-09 See full Michigan outage report →

Which EV Charging Networks Operate in Douglas, MI?

Infrastructure Grade

50% DC Fast

Based on DC Fast Charger ratio

2 of 4 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 2.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Douglas, Michigan has 2 publicly accessible EV charging stations with 4 charging ports. RED_E operates 100% of stations in the area — part of Michigan's 2,114 stations statewide.

50% of ports (2) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 50% (2) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our EV charging levels guide. View national charging statistics for broader context.

Drivers needing more charging options can find 74 stations in nearby Grand Rapids, approximately 48 miles away. See how MI compares with Ohio for broader regional context.

What Is the EV Charging Outlook for Douglas?

High-Speed Charging Hub

Douglas has exceptional DC fast charging coverage with 50% of ports being high-speed chargers, well above the national average.

RED_E Stronghold

RED_E leads the market in Douglas with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Douglas?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)