3 EV Charging Stations in Keedysville, MD
Locations, networks, and charger types — updated weekly from U.S. DOE data
3 EV charging stations in Keedysville — 1 Non-Networked, 1 Tesla Destination, 1 ChargePoint Network . Last updated May 9, 2026.
Where Are the 3 Charging Stations in Keedysville?
Which EV Charging Networks Operate in Keedysville, MD?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 6 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Keedysville, Maryland has 3 publicly accessible EV charging stations with 6 charging ports. Non-Networked operates 33.3% of stations in the area, followed by Tesla Destination at 33.3% — part of Maryland's 1,824 stations statewide.
All 6 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Available connector types include Tesla (NACS). Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 394 stations in nearby Washington, approximately 86 miles away. See how MD compares with Pennsylvania for broader regional context.
What Is the EV Charging Outlook for Keedysville?
Level 2 Focused Infrastructure
Keedysville's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Competitive Charging Market
No single network dominates Keedysville, with 3 providers competing to offer the best charging experience.
Where Else Can I Charge Near Keedysville?
Washington, District of Columbia
Baltimore, Maryland
Arlington, Virginia
Columbia, Maryland
McLean, Virginia
Rockville, Maryland
Alexandria, Virginia
Bethesda, Maryland
Sterling, Virginia
Fairfax, Virginia
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
🏨 Charge While You Stay — Hotels with EV Charging in Keedysville
1 hotel with on-site EV charging · 1 Tesla Destination · 2 Level 2 ports
Antietam Overlook Farm, a Select Registry Property
⚡ Tesla4812 Porterstown Rd
Tesla Destination: full charge in 6–10 hrs overnight
📍 View on Map"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."