1 EV Charging Stations in Burtonsville, MD
Locations, networks, and charger types — updated weekly from U.S. DOE data
1 EV charging stations in Burtonsville — 1 Blink Network . Last updated May 9, 2026.
Where Are the 1 Charging Stations in Burtonsville?
Which EV Charging Networks Operate in Burtonsville, MD?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 4 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Burtonsville, Maryland has 1 publicly accessible EV charging station with 4 charging ports. Blink Network operates 100% of stations in the area — part of Maryland's 1,824 stations statewide.
All 4 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our Blink network. View national charging statistics for broader context.
Drivers needing more charging options can find 394 stations in nearby Washington, approximately 25 miles away. See how MD compares with Pennsylvania for broader regional context.
What Is the EV Charging Outlook for Burtonsville?
Level 2 Focused Infrastructure
Burtonsville's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Blink Network Stronghold
Blink Network leads the market in Burtonsville with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Burtonsville average 4.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Burtonsville?
Washington, District of Columbia
Baltimore, Maryland
Arlington, Virginia
Columbia, Maryland
McLean, Virginia
Rockville, Maryland
Alexandria, Virginia
Bethesda, Maryland
Sterling, Virginia
Fairfax, Virginia
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."