1 EV Charging Stations in Kinder, LA

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

As of March 2026, Kinder, Louisiana has 1 publicly accessible EV charging station with 6 charging ports. CHARGELAB operates 100% of stations in the area — part of Louisiana's 329 stations statewide.

All 6 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 25 stations in nearby Lafayette, approximately 82 miles away. See how LA compares with Texas for broader regional context.

1 EV charging stations in Kinder — 1 CHARGELAB . Last updated March 2026.

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 6 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 6.0

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Kinder, LA?

All 1 stations active as of 2026-03-22 See full Louisiana outage report →

Where Are the 1 Charging Stations in Kinder?

Coushatta Casino Resort

777 Coushatta Dr
CHARGELAB
J1772 (Level 2)

What Is the EV Charging Outlook for Kinder?

Level 2 Focused Infrastructure

Kinder's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

CHARGELAB Stronghold

CHARGELAB leads the market in Kinder with 100% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Kinder average 6.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Kinder?

Data source: U.S. Department of Energy — Alternative Fuels Data Center

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)