1 EV Charging Stations in Osage, IA
Locations, networks, and charger types — updated weekly from U.S. DOE data
1 EV charging stations in Osage — 1 Non-Networked . Last updated May 9, 2026.
Where Are the 1 Charging Stations in Osage?
Which EV Charging Networks Operate in Osage, IA?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 6 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Osage, Iowa has 1 publicly accessible EV charging station with 6 charging ports. Non-Networked operates 100% of stations in the area — part of Iowa's 509 stations statewide.
All 6 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 55 stations in nearby Rochester, approximately 87 miles away. See how IA compares with Illinois for broader regional context.
What Is the EV Charging Outlook for Osage?
Level 2 Focused Infrastructure
Osage's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Non-Networked Stronghold
Non-Networked leads the market in Osage with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Osage average 6.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Osage?
Rochester, Minnesota
Austin, Minnesota
Owatonna, Minnesota
Decorah, Iowa
Forest City, Iowa
Cedar Falls, Iowa
Waterloo, Iowa
Mason City, Iowa
Albert Lea, Minnesota
Stewartville, Minnesota
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."