1 EV Charging Stations in Early, IA

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

1 EV charging stations in Early — 1 CHARGELAB , 2 public DC fast chargers. Last updated May 9, 2026.

Where Are the 1 Charging Stations in Early?

Early Caseys

2245 Karr Ave.
CHARGELAB
CHAdeMO (DC Fast) CCS/SAE Combo
All 1 stations active as of 2026-05-09 See full Iowa outage report →

Which EV Charging Networks Operate in Early, IA?

Infrastructure Grade

100% DC Fast

Based on DC Fast Charger ratio

2 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Early, Iowa has 1 publicly accessible EV charging station with 2 charging ports. CHARGELAB operates 100% of stations in the area — part of Iowa's 509 stations statewide.

100% of ports (2) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our EV charging levels guide. View national charging statistics for broader context.

Drivers needing more charging options can find 4 stations in nearby Fort Dodge, approximately 80 miles away. See how IA compares with Illinois for broader regional context.

What Is the EV Charging Outlook for Early?

High-Speed Charging Hub

Early has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.

CHARGELAB Stronghold

CHARGELAB leads the market in Early with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Early?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)